Newport (S Wales)
1,015 delay minutes
The biggest share (21%) of the delay picked up at Newport (S Wales) in the four weeks to 9 December 2023 came from faulty trains.
65% of these minutes were knock-on from something that happened elsewhere first. 86% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 22 | 2% | 8% | 1 a day, more than 2 of the other 4 years | 2 |
| Signals, points and power | 186 | 18% | 16% | 7 a day, more than 2 of the other 4 years | 5 |
| Weather and structures | 8 | <1% | 7% | 0 a day, more than 1 of the other 4 years | 1 |
| Autumn | 6 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | 46 | 5% | 4% | 2 a day, more than 3 of the other 4 years | 5 |
| Network management | 115 | 11% | 17% | 4 a day, more than 2 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 210 | 21% | 16% | 7 a day, more than 3 of the other 4 years | 8 |
| Traincrew | 117 | 12% | 11% | 4 a day, more than 3 of the other 4 years | 4 |
| Stations | 105 | 10% | 3% | 4 a day, the most in 5 years | - |
| Operations | 37 | 4% | 5% | 1 a day, more than 3 of the other 4 years | 1 |
| Operator, other | 164 | 16% | 7% | 6 a day, the most in 5 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 102 |
| TG | Driver | 77 |
| T2 | Delay at unstaffed station to non-DOO train | 53 |
| IB | Points failure (including no fault found) | 48 |
| MY | Coupler, Coupler system and Jumper cable faults | 42 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 42 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 40 |
| TI | Traincrew rostering problem | 36 |
| VZ | Other passenger or external causes the responsibility of TOC | 36 |
| IJ | AWS/ATP/TPWS/Train stop/On track equipment failure | 33 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,141 |
| IB | Points failure (including no fault found) | 2,887 |
| MD | Technical failures below the solebar | 2,785 |
| J3 | Axle Counter Failure | 2,560 |
| M8 | Technical failures above the Solebar | 1,999 |
| I9 | Fires starting on Network Rail Infrastructure | 1,924 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,818 |
| OU | Delays not Investigated by Network Rail | 1,784 |
| XR | Cable vandalism or theft | 1,762 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,594 |