Leaves on the Line

Newport (S Wales)

NWP Wales route
CSV JSON

1,015 delay minutes

The biggest share (21%) of the delay picked up at Newport (S Wales) in the four weeks to 9 December 2023 came from faulty trains.

65% of these minutes were knock-on from something that happened elsewhere first. 86% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track222%8% 1 a day, more than 2 of the other 4 years2
Signals, points and power18618%16% 7 a day, more than 2 of the other 4 years5
Weather and structures8<1%7% 0 a day, more than 1 of the other 4 years1
Autumn6<1%7% 0 a day, more than 1 of the other 4 years-
External465%4% 2 a day, more than 3 of the other 4 years5
Network management11511%17% 4 a day, more than 2 of the other 4 years1
The operators' causes
Train faults21021%16% 7 a day, more than 3 of the other 4 years8
Traincrew11712%11% 4 a day, more than 3 of the other 4 years4
Stations10510%3% 4 a day, the most in 5 years-
Operations374%5% 1 a day, more than 3 of the other 4 years1
Operator, other16416%7% 6 a day, the most in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MPRail / wheel interface, adhesion problems (including ice on the running rail)102
TGDriver77
T2Delay at unstaffed station to non-DOO train53
IBPoints failure (including no fault found)48
MYCoupler, Coupler system and Jumper cable faults42
OCSignaller including mis-routing (not ERTM /ETCS related)42
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)40
TITraincrew rostering problem36
VZOther passenger or external causes the responsibility of TOC36
IJAWS/ATP/TPWS/Train stop/On track equipment failure33
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver3,141
IBPoints failure (including no fault found)2,887
MDTechnical failures below the solebar2,785
J3Axle Counter Failure2,560
M8Technical failures above the Solebar1,999
I9Fires starting on Network Rail Infrastructure1,924
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,818
OUDelays not Investigated by Network Rail1,784
XRCable vandalism or theft1,762
OCSignaller including mis-routing (not ERTM /ETCS related)1,594