363 delay minutes

Most of the delay picked up at Newtown (Powys) in the four weeks to 9 December 2023 came from faulty trains.

51% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power247%16% 1 a day, more than 3 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn41%7% 0 a day, more than 2 of the other 4 years-
External6819%4% 2 a day, the most in 5 years-
Network management257%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults18551%16% 7 a day, the most in 5 years-
Traincrew236%11% 1 a day, more than 3 of the other 4 years-
Stations2<1%3% 0 a day, more than 1 of the other 4 years-
Operations329%5% 1 a day, more than 3 of the other 4 years-
Operator, other--7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M8Technical failures above the Solebar85
XPBRIDGE HIT68
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps46
MCDiesel Loco failure, defect, attention40
TZOther Passenger Train Operating Company causes32
OCSignaller including mis-routing (not ERTM /ETCS related)25
TGDriver17
MTConfirmed train borne safety system faults (not cab based)10
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure9
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles8
Since 2018
CodeWhat Network Rail loggedMinutes
TZOther Passenger Train Operating Company causes754
M0Confirmed train cab based safety system fault (including GSMR)568
MDTechnical failures below the solebar509
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)390
XPBRIDGE HIT359
T2Delay at unstaffed station to non-DOO train281
M8Technical failures above the Solebar267
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure244
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail242
J0Telecom equipment radio failure (GSM-R)230