Newtown (Powys)
363 delay minutes
Most of the delay picked up at Newtown (Powys) in the four weeks to 9 December 2023 came from faulty trains.
51% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 24 | 7% | 16% | 1 a day, more than 3 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 4 | 1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 68 | 19% | 4% | 2 a day, the most in 5 years | - |
| Network management | 25 | 7% | 17% | 1 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 185 | 51% | 16% | 7 a day, the most in 5 years | - |
| Traincrew | 23 | 6% | 11% | 1 a day, more than 3 of the other 4 years | - |
| Stations | 2 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 32 | 9% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M8 | Technical failures above the Solebar | 85 |
| XP | BRIDGE HIT | 68 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 46 |
| MC | Diesel Loco failure, defect, attention | 40 |
| TZ | Other Passenger Train Operating Company causes | 32 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 25 |
| TG | Driver | 17 |
| MT | Confirmed train borne safety system faults (not cab based) | 10 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 9 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TZ | Other Passenger Train Operating Company causes | 754 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 568 |
| MD | Technical failures below the solebar | 509 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 390 |
| XP | BRIDGE HIT | 359 |
| T2 | Delay at unstaffed station to non-DOO train | 281 |
| M8 | Technical failures above the Solebar | 267 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 244 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 242 |
| J0 | Telecom equipment radio failure (GSM-R) | 230 |