307 delay minutes

Most of the delay picked up at Oban in the four weeks to 9 December 2023 came from how the network was run.

79% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power--16% 0 a day, the least in 5 years-
Weather and structures3812%7% 1 a day, the most in 5 years1
Autumn3<1%7% 0 a day, more than 3 of the other 4 years-
External52%4% 0 a day, more than 3 of the other 4 years-
Network management23075%17% 8 a day, the most in 5 years24
The operators' causes
Train faults41%16% 0 a day, more than 1 of the other 4 years1
Traincrew258%11% 1 a day, the most in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other3<1%7% 0 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards194
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions38
T3Waiting connections from other transport modes25
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)21
I8Animal Strike or Incursion within the control of Network Rail12
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)5
MNBrake and brake systems faults; including wheel flats where no other cause had been identified4
ZUNo Cause Identified After investigation by both Parties3
MPRail / wheel interface, adhesion problems (including ice on the running rail)3
Q3NZ Pumps T3
Since 2018
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions2,471
MDTechnical failures below the solebar512
M8Technical failures above the Solebar483
TGDriver463
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail361
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards314
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)221
IBPoints failure (including no fault found)214
ZUNo Cause Identified After investigation by both Parties201
M0Confirmed train cab based safety system fault (including GSMR)182