Oban
307 delay minutes
Most of the delay picked up at Oban in the four weeks to 9 December 2023 came from how the network was run.
79% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | 38 | 12% | 7% | 1 a day, the most in 5 years | 1 |
| Autumn | 3 | <1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 5 | 2% | 4% | 0 a day, more than 3 of the other 4 years | - |
| Network management | 230 | 75% | 17% | 8 a day, the most in 5 years | 24 |
| The operators' causes | |||||
| Train faults | 4 | 1% | 16% | 0 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 25 | 8% | 11% | 1 a day, the most in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 3 | <1% | 7% | 0 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 194 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 38 |
| T3 | Waiting connections from other transport modes | 25 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 21 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 12 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 5 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 4 |
| ZU | No Cause Identified After investigation by both Parties | 3 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 3 |
| Q3 | NZ Pumps T | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 2,471 |
| MD | Technical failures below the solebar | 512 |
| M8 | Technical failures above the Solebar | 483 |
| TG | Driver | 463 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 361 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 314 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 221 |
| IB | Points failure (including no fault found) | 214 |
| ZU | No Cause Identified After investigation by both Parties | 201 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 182 |