100 delay minutes

The biggest share (31%) of the delay picked up at Old Street in the four weeks to 9 December 2023 came from signal, points and power faults.

69% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power3131%16% 1 a day, more than 2 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn55%7% 0 a day, more than 1 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management2525%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults1919%16% 1 a day, the least in 5 years-
Traincrew88%11% 0 a day, the least in 5 years-
Stations33%3% 0 a day, more than 1 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other99%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IJAWS/ATP/TPWS/Train stop/On track equipment failure11
M7Door and Door system faults11
I2AC/DC trip (including no fault or cause found)9
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)9
M8Technical failures above the Solebar8
TGDriver8
J0Telecom equipment radio failure (GSM-R)6
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure5
ORLOM directive or Signaller correctly applying local instructions (ex late running trains or infrastructure Accepted Limitation)5
VBVandalism or theft4
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver6,217
MDTechnical failures below the solebar1,960
TITraincrew rostering problem1,472
M8Technical failures above the Solebar1,340
IASignal failure (including no fault found)1,007
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure773
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.650
IJAWS/ATP/TPWS/Train stop/On track equipment failure600
ICTrack circuit failure (including no fault found)595
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards550