5,639 delay minutes

The biggest share (35%) of the delay picked up at Peterborough in the four weeks to 9 December 2023 came from signal, points and power faults.

48% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2635%8% 9 a day, more than 2 of the other 4 years-
Signals, points and power1,95835%16% 70 a day, the most in 5 years13
Weather and structures1032%7% 4 a day, more than 2 of the other 4 years-
Autumn3085%7% 11 a day, the most in 5 years2
External1232%4% 4 a day, more than 2 of the other 4 years1
Network management1,15220%17% 41 a day, more than 3 of the other 4 years100
The operators' causes
Train faults65612%16% 23 a day, more than 3 of the other 4 years4
Traincrew76814%11% 27 a day, the most in 5 years51
Stations581%3% 2 a day, more than 2 of the other 4 years-
Operations932%5% 3 a day, more than 2 of the other 4 years-
Operator, other1583%7% 6 a day, more than 1 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I1Overhead line/third rail defect1,292
TGDriver428
IESignalling Functional Power Supply Failure306
I8Animal Strike or Incursion within the control of Network Rail295
QJSpecial working for leaf-fall track circuit operation272
TITraincrew rostering problem237
OUDelays not Investigated by Network Rail204
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.163
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)144
M8Technical failures above the Solebar136
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver17,229
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.12,328
I1Overhead line/third rail defect10,133
TITraincrew rostering problem10,068
M8Technical failures above the Solebar7,749
IBPoints failure (including no fault found)6,235
MDTechnical failures below the solebar6,024
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)5,466
ICTrack circuit failure (including no fault found)5,183
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail4,929