5,639 delay minutes
The biggest share (35%) of the delay picked up at Peterborough in the four weeks to 9 December 2023 came from signal, points and power faults.
48% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 263 | 5% | 8% | 9 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 1,958 | 35% | 16% | 70 a day, the most in 5 years | 13 |
| Weather and structures | 103 | 2% | 7% | 4 a day, more than 2 of the other 4 years | - |
| Autumn | 308 | 5% | 7% | 11 a day, the most in 5 years | 2 |
| External | 123 | 2% | 4% | 4 a day, more than 2 of the other 4 years | 1 |
| Network management | 1,152 | 20% | 17% | 41 a day, more than 3 of the other 4 years | 100 |
| The operators' causes | |||||
| Train faults | 656 | 12% | 16% | 23 a day, more than 3 of the other 4 years | 4 |
| Traincrew | 768 | 14% | 11% | 27 a day, the most in 5 years | 51 |
| Stations | 58 | 1% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 93 | 2% | 5% | 3 a day, more than 2 of the other 4 years | - |
| Operator, other | 158 | 3% | 7% | 6 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I1 | Overhead line/third rail defect | 1,292 |
| TG | Driver | 428 |
| IE | Signalling Functional Power Supply Failure | 306 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 295 |
| QJ | Special working for leaf-fall track circuit operation | 272 |
| TI | Traincrew rostering problem | 237 |
| OU | Delays not Investigated by Network Rail | 204 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 163 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 144 |
| M8 | Technical failures above the Solebar | 136 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 17,229 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 12,328 |
| I1 | Overhead line/third rail defect | 10,133 |
| TI | Traincrew rostering problem | 10,068 |
| M8 | Technical failures above the Solebar | 7,749 |
| IB | Points failure (including no fault found) | 6,235 |
| MD | Technical failures below the solebar | 6,024 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 5,466 |
| IC | Track circuit failure (including no fault found) | 5,183 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 4,929 |