1,369 delay minutes

The biggest share (33%) of the delay picked up at Potters Bar in the four weeks to 9 December 2023 came from how the network was run.

70% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track645%8% 2 a day, more than 2 of the other 4 years-
Signals, points and power14010%16% 5 a day, the least in 5 years-
Weather and structures3<1%7% 0 a day, the least in 5 years-
Autumn836%7% 3 a day, more than 1 of the other 4 years-
External554%4% 2 a day, more than 2 of the other 4 years-
Network management44733%17% 16 a day, more than 3 of the other 4 years1
The operators' causes
Train faults15511%16% 6 a day, more than 2 of the other 4 years-
Traincrew20715%11% 7 a day, more than 1 of the other 4 years-
Stations383%3% 1 a day, more than 3 of the other 4 years-
Operations181%5% 1 a day, more than 2 of the other 4 years-
Operator, other16012%7% 6 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver157
OUDelays not Investigated by Network Rail122
M8Technical failures above the Solebar91
VHPassenger Communication cord, door egress or emergency train alarm operated91
I1Overhead line/third rail defect59
OCSignaller including mis-routing (not ERTM /ETCS related)48
XPBRIDGE HIT46
Q3NZ Pumps T46
TTLeaf fall Neutral46
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)44
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver11,703
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.9,073
I1Overhead line/third rail defect5,094
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail4,396
IBPoints failure (including no fault found)4,264
TITraincrew rostering problem4,036
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3,772
M8Technical failures above the Solebar3,743
IASignal failure (including no fault found)3,083
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards3,033