0 delay minutes

No delay was picked up at Pencoed in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
TH(Senior) Conductor/Train Manager60
M7Door and Door system faults60
TZOther Passenger Train Operating Company causes41
TGDriver32
I8Animal Strike or Incursion within the control of Network Rail27
OUDelays not Investigated by Network Rail17
J3Axle Counter Failure17
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps12
T2Delay at unstaffed station to non-DOO train11
MNBrake and brake systems faults; including wheel flats where no other cause had been identified9