Paisley Canal
329 delay minutes
The biggest share (23%) of the delay picked up at Paisley Canal in the four weeks to 9 December 2023 came from autumn leaves.
78% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | <1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | 1 |
| Weather and structures | 53 | 16% | 7% | 2 a day, the most in 5 years | - |
| Autumn | 76 | 23% | 7% | 3 a day, the most in 5 years | - |
| External | 19 | 6% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 20 | 6% | 17% | 1 a day, more than 1 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 52 | 16% | 16% | 2 a day, the most in 5 years | 1 |
| Traincrew | 25 | 8% | 11% | 1 a day, more than 3 of the other 4 years | 1 |
| Stations | 5 | 2% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 5 | 2% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 72 | 22% | 7% | 3 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 70 |
| Q3 | NZ Pumps T | 68 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 53 |
| M8 | Technical failures above the Solebar | 26 |
| TG | Driver | 25 |
| MU | Depot operating problem | 16 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 16 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 8 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 7 |
| MB | Electic Loco failure, defect, attention | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,503 |
| TG | Driver | 1,219 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,098 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 984 |
| IB | Points failure (including no fault found) | 897 |
| Q3 | NZ Pumps T | 642 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 567 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 432 |
| M8 | Technical failures above the Solebar | 415 |
| IA | Signal failure (including no fault found) | 412 |