329 delay minutes

The biggest share (23%) of the delay picked up at Paisley Canal in the four weeks to 9 December 2023 came from autumn leaves.

78% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3<1%8% 0 a day, the least in 5 years-
Signals, points and power--16% 0 a day, the least in 5 years1
Weather and structures5316%7% 2 a day, the most in 5 years-
Autumn7623%7% 3 a day, the most in 5 years-
External196%4% 1 a day, more than 3 of the other 4 years-
Network management206%17% 1 a day, more than 1 of the other 4 years1
The operators' causes
Train faults5216%16% 2 a day, the most in 5 years1
Traincrew258%11% 1 a day, more than 3 of the other 4 years1
Stations52%3% 0 a day, more than 3 of the other 4 years-
Operations52%5% 0 a day, more than 2 of the other 4 years-
Operator, other7222%7% 3 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MPRail / wheel interface, adhesion problems (including ice on the running rail)70
Q3NZ Pumps T68
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed53
M8Technical failures above the Solebar26
TGDriver25
MUDepot operating problem16
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)16
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed8
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)7
MBElectic Loco failure, defect, attention7
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,503
TGDriver1,219
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,098
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure984
IBPoints failure (including no fault found)897
Q3NZ Pumps T642
MPRail / wheel interface, adhesion problems (including ice on the running rail)567
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions432
M8Technical failures above the Solebar415
IASignal failure (including no fault found)412