Penarth
1,671 delay minutes
The biggest share (27%) of the delay picked up at Penarth in the four weeks to 9 December 2023 came from the operators' own operations.
95% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 85 | 5% | 8% | 3 a day, the most in 5 years | 2 |
| Signals, points and power | 286 | 17% | 16% | 10 a day, more than 3 of the other 4 years | 9 |
| Weather and structures | 12 | <1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 7 | <1% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 133 | 8% | 17% | 5 a day, the least in 5 years | 6 |
| The operators' causes | |||||
| Train faults | 299 | 18% | 16% | 11 a day, the least in 5 years | 20 |
| Traincrew | 252 | 15% | 11% | 9 a day, more than 2 of the other 4 years | 2 |
| Stations | 104 | 6% | 3% | 4 a day, more than 1 of the other 4 years | - |
| Operations | 456 | 27% | 5% | 16 a day, the most in 5 years | 1 |
| Operator, other | 37 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TZ | Other Passenger Train Operating Company causes | 450 |
| J3 | Axle Counter Failure | 248 |
| TG | Driver | 133 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 112 |
| T2 | Delay at unstaffed station to non-DOO train | 92 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 85 |
| MU | Depot operating problem | 62 |
| TH | (Senior) Conductor/Train Manager | 62 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 46 |
| MD | Technical failures below the solebar | 41 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 4,465 |
| TG | Driver | 4,299 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 3,748 |
| TH | (Senior) Conductor/Train Manager | 3,614 |
| MD | Technical failures below the solebar | 3,542 |
| M8 | Technical failures above the Solebar | 2,765 |
| OU | Delays not Investigated by Network Rail | 2,520 |
| TZ | Other Passenger Train Operating Company causes | 2,110 |
| M7 | Door and Door system faults | 1,670 |
| J3 | Axle Counter Failure | 1,628 |