Pitlochry
1,011 delay minutes
The biggest share (40%) of the delay picked up at Pitlochry in the four weeks to 9 December 2023 came from weather and structures.
46% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 6 | <1% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 69 | 7% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 403 | 40% | 7% | 14 a day, the most in 5 years | - |
| Autumn | 32 | 3% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 182 | 18% | 17% | 6 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 231 | 23% | 16% | 8 a day, the most in 5 years | - |
| Traincrew | 28 | 3% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 18 | 2% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 12 | 1% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 32 | 3% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 230 |
| JK | Flooding not due to exceptional weather | 127 |
| ZU | No Cause Identified After investigation by both Parties | 82 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 54 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 54 |
| M7 | Door and Door system faults | 50 |
| MC | Diesel Loco failure, defect, attention | 45 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 43 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 32 |
| Q3 | NZ Pumps T | 32 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 6,534 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 2,834 |
| MD | Technical failures below the solebar | 2,782 |
| TG | Driver | 2,663 |
| IC | Track circuit failure (including no fault found) | 1,591 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,509 |
| Q3 | NZ Pumps T | 1,316 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,300 |
| MC | Diesel Loco failure, defect, attention | 1,288 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 1,234 |