Leaves on the Line

Polegate

PLG Sussex route
CSV JSON

1,280 delay minutes

The biggest share (45%) of the delay picked up at Polegate in the four weeks to 9 December 2023 came from track faults.

27% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track57345%8% 20 a day, the most in 5 years-
Signals, points and power16513%16% 6 a day, the most in 5 years-
Weather and structures464%7% 2 a day, more than 3 of the other 4 years-
Autumn2<1%7% 0 a day, more than 2 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management32926%17% 12 a day, the most in 5 years-
The operators' causes
Train faults232%16% 1 a day, more than 1 of the other 4 years-
Traincrew1038%11% 4 a day, the most in 5 years-
Stations6<1%3% 0 a day, more than 1 of the other 4 years-
Operations212%5% 1 a day, more than 2 of the other 4 years-
Operator, other12<1%7% 0 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail570
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)104
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)97
TGDriver90
OCSignaller including mis-routing (not ERTM /ETCS related)64
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles58
JKFlooding not due to exceptional weather39
IASignal failure (including no fault found)33
ICTrack circuit failure (including no fault found)24
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive21
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,769
IRBroken/cracked/twisted/buckled/flawed rail2,013
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,838
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,509
TGDriver1,491
OCSignaller including mis-routing (not ERTM /ETCS related)1,107
J3Axle Counter Failure1,008
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions874
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure823
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)793