Pembroke Dock
401 delay minutes
The biggest share (33%) of the delay picked up at Pembroke Dock in the four weeks to 9 December 2023 came from faulty trains.
75% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 30 | 7% | 8% | 1 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 33 | 8% | 16% | 1 a day, more than 3 of the other 4 years | - |
| Weather and structures | 13 | 3% | 7% | 0 a day, more than 3 of the other 4 years | 3 |
| Autumn | 36 | 9% | 7% | 1 a day, the most in 5 years | - |
| External | 19 | 5% | 4% | 1 a day, the most in 5 years | - |
| Network management | 1 | <1% | 17% | 0 a day, the least in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 133 | 33% | 16% | 5 a day, the most in 5 years | 4 |
| Traincrew | 52 | 13% | 11% | 2 a day, the most in 5 years | 5 |
| Stations | 33 | 8% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 23 | 6% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 29 | 7% | 7% | 1 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 84 |
| TH | (Senior) Conductor/Train Manager | 36 |
| T2 | Delay at unstaffed station to non-DOO train | 33 |
| QH | Adhesion problems due to leaf contamination | 32 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 30 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 28 |
| VE | Ticket irregularities or refusals to pay | 20 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 19 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 19 |
| II | Signalling lineside cable fault | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 1,261 |
| TG | Driver | 890 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 796 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 702 |
| MD | Technical failures below the solebar | 671 |
| TH | (Senior) Conductor/Train Manager | 590 |
| OU | Delays not Investigated by Network Rail | 538 |
| M8 | Technical failures above the Solebar | 461 |
| TZ | Other Passenger Train Operating Company causes | 385 |
| IB | Points failure (including no fault found) | 309 |