Leaves on the Line

Polmont

PMT Scotland route
CSV JSON

208 delay minutes

The biggest share (43%) of the delay picked up at Polmont in the four weeks to 9 December 2023 came from faulty trains.

75% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track31%8% 0 a day, the least in 5 years-
Signals, points and power94%16% 0 a day, the least in 5 years-
Weather and structures157%7% 1 a day, the most in 5 years-
Autumn126%7% 0 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management3416%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults9043%16% 3 a day, more than 3 of the other 4 years-
Traincrew84%11% 0 a day, more than 1 of the other 4 years-
Stations105%3% 0 a day, more than 2 of the other 4 years-
Operations84%5% 0 a day, the least in 5 years-
Operator, other199%7% 1 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M8Technical failures above the Solebar38
MDTechnical failures below the solebar35
OCSignaller including mis-routing (not ERTM /ETCS related)17
Q3NZ Pumps T12
JKFlooding not due to exceptional weather11
MPRail / wheel interface, adhesion problems (including ice on the running rail)11
TGDriver8
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)8
RQUn-booked assistance for a person with reduced mobility joining/alighting,7
VHPassenger Communication cord, door egress or emergency train alarm operated7
Since 2018
CodeWhat Network Rail loggedMinutes
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure2,529
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.999
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)931
TGDriver754
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure600
IBPoints failure (including no fault found)532
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions517
M8Technical failures above the Solebar449
M7Door and Door system faults392
MDTechnical failures below the solebar372