Leaves on the Line

Preston Park

PRP Sussex route
CSV JSON

1,113 delay minutes

The biggest share (36%) of the delay picked up at Preston Park in the four weeks to 9 December 2023 came from how the network was run.

61% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track11711%8% 4 a day, the most in 5 years2
Signals, points and power20819%16% 7 a day, more than 1 of the other 4 years-
Weather and structures262%7% 1 a day, more than 2 of the other 4 years1
Autumn7<1%7% 0 a day, the least in 5 years-
External17316%4% 6 a day, the most in 5 years-
Network management39836%17% 14 a day, more than 2 of the other 4 years1
The operators' causes
Train faults353%16% 1 a day, the least in 5 years3
Traincrew817%11% 3 a day, the least in 5 years1
Stations202%3% 1 a day, more than 3 of the other 4 years-
Operations232%5% 1 a day, more than 2 of the other 4 years-
Operator, other262%7% 1 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XBVandalism or theft (including the placing of objects on the line)170
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)144
IASignal failure (including no fault found)82
TGDriver78
OBDelayed by signaller not applying applicable regulating policy73
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)65
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.62
IRBroken/cracked/twisted/buckled/flawed rail47
OCSignaller including mis-routing (not ERTM /ETCS related)46
IBPoints failure (including no fault found)40
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)6,286
TGDriver5,588
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3,487
OBDelayed by signaller not applying applicable regulating policy3,389
ICTrack circuit failure (including no fault found)3,380
OCSignaller including mis-routing (not ERTM /ETCS related)3,114
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,507
IBPoints failure (including no fault found)2,283
M8Technical failures above the Solebar2,262
IRBroken/cracked/twisted/buckled/flawed rail2,133