1,676 delay minutes

The biggest share (29%) of the delay picked up at Port Talbot Parkway in the four weeks to 9 December 2023 came from faulty trains.

51% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track714%8% 3 a day, more than 3 of the other 4 years-
Signals, points and power1519%16% 5 a day, more than 3 of the other 4 years-
Weather and structures9<1%7% 0 a day, more than 1 of the other 4 years-
Autumn382%7% 1 a day, the most in 5 years-
External13<1%4% 0 a day, more than 3 of the other 4 years-
Network management39924%17% 14 a day, more than 3 of the other 4 years-
The operators' causes
Train faults49329%16% 18 a day, the most in 5 years1
Traincrew21413%11% 8 a day, the most in 5 years1
Stations1418%3% 5 a day, the most in 5 years-
Operations905%5% 3 a day, more than 3 of the other 4 years1
Operator, other583%7% 2 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps196
TGDriver150
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)120
MCDiesel Loco failure, defect, attention117
OCSignaller including mis-routing (not ERTM /ETCS related)94
T2Delay at unstaffed station to non-DOO train85
TZOther Passenger Train Operating Company causes79
Q1Takeback Pumps73
M8Technical failures above the Solebar61
ICTrack circuit failure (including no fault found)59
Since 2018
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)4,618
MDTechnical failures below the solebar3,350
TGDriver2,899
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps2,799
T2Delay at unstaffed station to non-DOO train2,665
OCSignaller including mis-routing (not ERTM /ETCS related)1,999
ICTrack circuit failure (including no fault found)1,732
M8Technical failures above the Solebar1,725
IBPoints failure (including no fault found)1,621
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,512