Pantyffynnon
346 delay minutes
The biggest share (30%) of the delay picked up at Pantyffynnon in the four weeks to 9 December 2023 came from problems at stations.
44% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 78 | 23% | 16% | 3 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 5 | 1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 41 | 12% | 17% | 1 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 38 | 11% | 16% | 1 a day, the most in 5 years | - |
| Traincrew | 52 | 15% | 11% | 2 a day, the most in 5 years | - |
| Stations | 104 | 30% | 3% | 4 a day, the most in 5 years | - |
| Operations | 21 | 6% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 8 | 2% | 7% | 0 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 104 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 35 |
| TH | (Senior) Conductor/Train Manager | 29 |
| JF | Off track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure) | 22 |
| TG | Driver | 17 |
| IC | Track circuit failure (including no fault found) | 14 |
| M9 | Reported fleet equipment defect - no fault found | 14 |
| TZ | Other Passenger Train Operating Company causes | 13 |
| M8 | Technical failures above the Solebar | 12 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 2,376 |
| TH | (Senior) Conductor/Train Manager | 486 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 463 |
| TG | Driver | 427 |
| IC | Track circuit failure (including no fault found) | 321 |
| OU | Delays not Investigated by Network Rail | 300 |
| M8 | Technical failures above the Solebar | 279 |
| IB | Points failure (including no fault found) | 278 |
| MD | Technical failures below the solebar | 261 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 229 |