Leaves on the Line

Perth

PTH Scotland route
CSV JSON

2,608 delay minutes

The biggest share (26%) of the delay picked up at Perth in the four weeks to 9 December 2023 came from signal, points and power faults.

56% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track843%8% 3 a day, more than 2 of the other 4 years-
Signals, points and power68226%16% 24 a day, more than 3 of the other 4 years4
Weather and structures66525%7% 24 a day, the most in 5 years6
Autumn843%7% 3 a day, more than 1 of the other 4 years-
External572%4% 2 a day, the least in 5 years-
Network management33313%17% 12 a day, more than 3 of the other 4 years20
The operators' causes
Train faults24810%16% 9 a day, more than 2 of the other 4 years12
Traincrew1978%11% 7 a day, more than 2 of the other 4 years5
Stations763%3% 3 a day, more than 1 of the other 4 years-
Operations713%5% 3 a day, the most in 5 years1
Operator, other1124%7% 4 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions455
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure252
ICTrack circuit failure (including no fault found)178
JKFlooding not due to exceptional weather147
TGDriver142
IBPoints failure (including no fault found)113
ZUNo Cause Identified After investigation by both Parties85
Q3NZ Pumps T71
IASignal failure (including no fault found)65
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)65
Since 2018
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties10,763
TGDriver7,726
MDTechnical failures below the solebar6,421
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions6,212
M8Technical failures above the Solebar4,716
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure4,317
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure4,234
ICTrack circuit failure (including no fault found)3,721
IBPoints failure (including no fault found)3,275
IASignal failure (including no fault found)3,174