Perth
2,608 delay minutes
The biggest share (26%) of the delay picked up at Perth in the four weeks to 9 December 2023 came from signal, points and power faults.
56% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 84 | 3% | 8% | 3 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 682 | 26% | 16% | 24 a day, more than 3 of the other 4 years | 4 |
| Weather and structures | 665 | 25% | 7% | 24 a day, the most in 5 years | 6 |
| Autumn | 84 | 3% | 7% | 3 a day, more than 1 of the other 4 years | - |
| External | 57 | 2% | 4% | 2 a day, the least in 5 years | - |
| Network management | 333 | 13% | 17% | 12 a day, more than 3 of the other 4 years | 20 |
| The operators' causes | |||||
| Train faults | 248 | 10% | 16% | 9 a day, more than 2 of the other 4 years | 12 |
| Traincrew | 197 | 8% | 11% | 7 a day, more than 2 of the other 4 years | 5 |
| Stations | 76 | 3% | 3% | 3 a day, more than 1 of the other 4 years | - |
| Operations | 71 | 3% | 5% | 3 a day, the most in 5 years | 1 |
| Operator, other | 112 | 4% | 7% | 4 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 455 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 252 |
| IC | Track circuit failure (including no fault found) | 178 |
| JK | Flooding not due to exceptional weather | 147 |
| TG | Driver | 142 |
| IB | Points failure (including no fault found) | 113 |
| ZU | No Cause Identified After investigation by both Parties | 85 |
| Q3 | NZ Pumps T | 71 |
| IA | Signal failure (including no fault found) | 65 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 65 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 10,763 |
| TG | Driver | 7,726 |
| MD | Technical failures below the solebar | 6,421 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 6,212 |
| M8 | Technical failures above the Solebar | 4,716 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 4,317 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,234 |
| IC | Track circuit failure (including no fault found) | 3,721 |
| IB | Points failure (including no fault found) | 3,275 |
| IA | Signal failure (including no fault found) | 3,174 |