Partick
46 delay minutes
The biggest share (25%) of the delay picked up at Partick in the four weeks to 9 December 2023 came from autumn leaves.
91% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 3 | 7% | 8% | - |
| Signals, points and power | - | - | 16% | 2 |
| Weather and structures | - | - | 7% | - |
| Autumn | 12 | 25% | 7% | - |
| External | - | - | 4% | - |
| Network management | 8 | 17% | 17% | 1 |
| The operators' causes | ||||
| Train faults | 8 | 17% | 16% | 3 |
| Traincrew | 4 | 9% | 11% | 1 |
| Stations | - | - | 3% | - |
| Operations | 4 | 9% | 5% | - |
| Operator, other | 8 | 16% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M8 | Technical failures above the Solebar | 8 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 8 |
| Q3 | NZ Pumps T | 8 |
| OA | Regulation Decision Made With Best Endeavours | 4 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 4 |
| QI | Cautioning due to railhead leaf contamination | 4 |
| TG | Driver | 4 |
| TZ | Other Passenger Train Operating Company causes | 4 |
| JB | Reactionary Delay to 'P' coded TSRs | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 125 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 119 |
| M8 | Technical failures above the Solebar | 108 |
| QM | Train schedule/STP Process including erroneous simplifiers | 106 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 80 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 78 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 63 |
| IC | Track circuit failure (including no fault found) | 63 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 58 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 57 |