Leaves on the Line

Partick

PTK Scotland route
CSV JSON

46 delay minutes

The biggest share (25%) of the delay picked up at Partick in the four weeks to 9 December 2023 came from autumn leaves.

91% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track37%8%-
Signals, points and power--16%2
Weather and structures--7%-
Autumn1225%7%-
External--4%-
Network management817%17%1
The operators' causes
Train faults817%16%3
Traincrew49%11%1
Stations--3%-
Operations49%5%-
Operator, other816%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M8Technical failures above the Solebar8
MPRail / wheel interface, adhesion problems (including ice on the running rail)8
Q3NZ Pumps T8
OARegulation Decision Made With Best Endeavours4
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)4
QICautioning due to railhead leaf contamination4
TGDriver4
TZOther Passenger Train Operating Company causes4
JBReactionary Delay to 'P' coded TSRs3
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver125
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure119
M8Technical failures above the Solebar108
QMTrain schedule/STP Process including erroneous simplifiers106
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)80
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)78
X8Animal Strike or incursion not within the control of Network Rail63
ICTrack circuit failure (including no fault found)63
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)58
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards57