Porthmadog
7 delay minutes
Most of the delay picked up at Porthmadog in the four weeks to 9 December 2023 came from how the network was run.
0% of these minutes were knock-on from something that happened elsewhere first. 86% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 3 | 43% | 4% | 0 a day, more than 3 of the other 4 years | - |
| Network management | 4 | 57% | 17% | 0 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | - |
| Traincrew | - | - | 11% | 0 a day, the least in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XP | BRIDGE HIT | 3 |
| ZU | No Cause Identified After investigation by both Parties | 3 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 1 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 2,714 |
| TZ | Other Passenger Train Operating Company causes | 486 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 390 |
| T2 | Delay at unstaffed station to non-DOO train | 389 |
| OZ | Other Network Rail operating causes | 352 |
| IK | Telecom equipment failure (including no fault found) | 319 |
| J0 | Telecom equipment radio failure (GSM-R) | 256 |
| OU | Delays not Investigated by Network Rail | 196 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 180 |
| MD | Technical failures below the solebar | 175 |