1,083 delay minutes

The biggest share (50%) of the delay picked up at Pulborough in the four weeks to 9 December 2023 came from track faults.

28% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track54050%8% 19 a day, the most in 5 years-
Signals, points and power767%16% 3 a day, the least in 5 years-
Weather and structures6<1%7% 0 a day, more than 2 of the other 4 years-
Autumn3<1%7% 0 a day, more than 1 of the other 4 years-
External535%4% 2 a day, the most in 5 years-
Network management29227%17% 10 a day, the most in 5 years1
The operators' causes
Train faults172%16% 1 a day, the least in 5 years-
Traincrew706%11% 3 a day, more than 2 of the other 4 years-
Stations2<1%3% 0 a day, more than 2 of the other 4 years-
Operations3<1%5% 0 a day, the least in 5 years-
Operator, other222%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail540
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)146
TGDriver63
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)51
OCSignaller including mis-routing (not ERTM /ETCS related)37
OBDelayed by signaller not applying applicable regulating policy27
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)27
XBVandalism or theft (including the placing of objects on the line)26
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles20
VHPassenger Communication cord, door egress or emergency train alarm operated19
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,888
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,977
TGDriver2,225
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,608
OCSignaller including mis-routing (not ERTM /ETCS related)1,594
IESignalling Functional Power Supply Failure1,381
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,252
OBDelayed by signaller not applying applicable regulating policy984
XDLevel Crossing Incidents including misuse and emergency services being prioritised over rail services979
IRBroken/cracked/twisted/buckled/flawed rail903