2,753 delay minutes

The biggest share (39%) of the delay picked up at Purley in the four weeks to 9 December 2023 came from how the network was run.

82% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1084%8% 4 a day, more than 2 of the other 4 years-
Signals, points and power71626%16% 26 a day, more than 2 of the other 4 years2
Weather and structures1194%7% 4 a day, more than 3 of the other 4 years-
Autumn16<1%7% 1 a day, the least in 5 years-
External1586%4% 6 a day, more than 2 of the other 4 years2
Network management1,08139%17% 39 a day, more than 1 of the other 4 years1
The operators' causes
Train faults1124%16% 4 a day, the least in 5 years2
Traincrew2078%11% 7 a day, the least in 5 years4
Stations612%3% 2 a day, more than 1 of the other 4 years-
Operations422%5% 2 a day, the least in 5 years-
Operator, other1335%7% 5 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)365
J5Infrastructure Asset fault reported but proven to be mistaken265
IISignalling lineside cable fault228
IBPoints failure (including no fault found)204
OCSignaller including mis-routing (not ERTM /ETCS related)172
TGDriver151
XPBRIDGE HIT103
OBDelayed by signaller not applying applicable regulating policy89
VHPassenger Communication cord, door egress or emergency train alarm operated89
IJAWS/ATP/TPWS/Train stop/On track equipment failure79
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)31,447
TGDriver29,409
OCSignaller including mis-routing (not ERTM /ETCS related)18,803
OBDelayed by signaller not applying applicable regulating policy13,915
ICTrack circuit failure (including no fault found)11,924
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.9,892
M8Technical failures above the Solebar7,077
IRBroken/cracked/twisted/buckled/flawed rail6,983
TITraincrew rostering problem6,278
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure6,086