Purley
2,753 delay minutes
The biggest share (39%) of the delay picked up at Purley in the four weeks to 9 December 2023 came from how the network was run.
82% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 108 | 4% | 8% | 4 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 716 | 26% | 16% | 26 a day, more than 2 of the other 4 years | 2 |
| Weather and structures | 119 | 4% | 7% | 4 a day, more than 3 of the other 4 years | - |
| Autumn | 16 | <1% | 7% | 1 a day, the least in 5 years | - |
| External | 158 | 6% | 4% | 6 a day, more than 2 of the other 4 years | 2 |
| Network management | 1,081 | 39% | 17% | 39 a day, more than 1 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 112 | 4% | 16% | 4 a day, the least in 5 years | 2 |
| Traincrew | 207 | 8% | 11% | 7 a day, the least in 5 years | 4 |
| Stations | 61 | 2% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 42 | 2% | 5% | 2 a day, the least in 5 years | - |
| Operator, other | 133 | 5% | 7% | 5 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 365 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 265 |
| II | Signalling lineside cable fault | 228 |
| IB | Points failure (including no fault found) | 204 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 172 |
| TG | Driver | 151 |
| XP | BRIDGE HIT | 103 |
| OB | Delayed by signaller not applying applicable regulating policy | 89 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 89 |
| IJ | AWS/ATP/TPWS/Train stop/On track equipment failure | 79 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 31,447 |
| TG | Driver | 29,409 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 18,803 |
| OB | Delayed by signaller not applying applicable regulating policy | 13,915 |
| IC | Track circuit failure (including no fault found) | 11,924 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 9,892 |
| M8 | Technical failures above the Solebar | 7,077 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 6,983 |
| TI | Traincrew rostering problem | 6,278 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 6,086 |