Leaves on the Line

Pontyclun

PYC Wales route
CSV JSON

2,622 delay minutes

The biggest share (34%) of the delay picked up at Pontyclun in the four weeks to 9 December 2023 came from faulty trains.

77% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1265%8% 5 a day, more than 2 of the other 4 years-
Signals, points and power2249%16% 8 a day, more than 2 of the other 4 years-
Weather and structures472%7% 2 a day, more than 2 of the other 4 years-
Autumn612%7% 2 a day, the most in 5 years-
External1094%4% 4 a day, the most in 5 years-
Network management36014%17% 13 a day, more than 2 of the other 4 years-
The operators' causes
Train faults88734%16% 32 a day, the most in 5 years-
Traincrew46718%11% 17 a day, the most in 5 years-
Stations1787%3% 6 a day, the most in 5 years-
Operations1345%5% 5 a day, more than 3 of the other 4 years-
Operator, other301%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver270
M8Technical failures above the Solebar248
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps212
M7Door and Door system faults194
T2Delay at unstaffed station to non-DOO train150
TH(Senior) Conductor/Train Manager91
XPBRIDGE HIT91
IASignal failure (including no fault found)76
OCSignaller including mis-routing (not ERTM /ETCS related)76
TZOther Passenger Train Operating Company causes67
Since 2018
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)29,532
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps5,868
TGDriver5,033
MDTechnical failures below the solebar4,056
T2Delay at unstaffed station to non-DOO train3,403
M8Technical failures above the Solebar3,214
OCSignaller including mis-routing (not ERTM /ETCS related)3,174
TZOther Passenger Train Operating Company causes3,006
TH(Senior) Conductor/Train Manager2,723
IBPoints failure (including no fault found)2,668