Paisley Gilmour Street
437 delay minutes
The biggest share (40%) of the delay picked up at Paisley Gilmour Street in the four weeks to 9 December 2023 came from how the network was run.
37% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 58 | 13% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Weather and structures | 12 | 3% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | 47 | 11% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 174 | 40% | 17% | 6 a day, the most in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 53 | 12% | 16% | 2 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 35 | 8% | 11% | 1 a day, the most in 5 years | 1 |
| Stations | 10 | 2% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 5 | 1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 45 | 10% | 7% | 2 a day, the least in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J8 | OTM DAMAGE | 112 |
| IA | Signal failure (including no fault found) | 58 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 44 |
| Q3 | NZ Pumps T | 42 |
| TG | Driver | 35 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 25 |
| MU | Depot operating problem | 23 |
| M7 | Door and Door system faults | 17 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 12 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 4,041 |
| TG | Driver | 1,723 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,663 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,652 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,467 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,345 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 1,259 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 1,193 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,087 |
| M8 | Technical failures above the Solebar | 1,028 |