Rannoch
324 delay minutes
The biggest share (40%) of the delay picked up at Rannoch in the four weeks to 9 December 2023 came from weather and structures.
21% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 12 | 4% | 8% | 0 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 16 | 5% | 16% | 1 a day, more than 3 of the other 4 years | - |
| Weather and structures | 128 | 40% | 7% | 5 a day, the most in 5 years | - |
| Autumn | 6 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 8 | 2% | 4% | 0 a day, the most in 5 years | - |
| Network management | 126 | 39% | 17% | 5 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 11 | 3% | 16% | 0 a day, more than 1 of the other 4 years | - |
| Traincrew | 5 | 2% | 11% | 0 a day, more than 2 of the other 4 years | - |
| Stations | 1 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 11 | 3% | 7% | 0 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 107 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 82 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 46 |
| IA | Signal failure (including no fault found) | 16 |
| ZU | No Cause Identified After investigation by both Parties | 12 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 11 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 8 |
| Q1 | Takeback Pumps | 7 |
| Q3 | NZ Pumps T | 6 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 3,140 |
| ZU | No Cause Identified After investigation by both Parties | 1,103 |
| MD | Technical failures below the solebar | 1,075 |
| TG | Driver | 800 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 605 |
| M8 | Technical failures above the Solebar | 593 |
| MC | Diesel Loco failure, defect, attention | 532 |
| IB | Points failure (including no fault found) | 454 |
| I0 | Telecom equipment legacy radio failures (RETB) | 432 |
| ML | Wagons, coaches and parcel vehicle faults | 280 |