Rannoch

RAN Scotland route
CSV JSON

324 delay minutes

The biggest share (40%) of the delay picked up at Rannoch in the four weeks to 9 December 2023 came from weather and structures.

21% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track124%8% 0 a day, more than 3 of the other 4 years-
Signals, points and power165%16% 1 a day, more than 3 of the other 4 years-
Weather and structures12840%7% 5 a day, the most in 5 years-
Autumn62%7% 0 a day, more than 2 of the other 4 years-
External82%4% 0 a day, the most in 5 years-
Network management12639%17% 5 a day, the most in 5 years-
The operators' causes
Train faults113%16% 0 a day, more than 1 of the other 4 years-
Traincrew52%11% 0 a day, more than 2 of the other 4 years-
Stations1<1%3% 0 a day, more than 2 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other113%7% 0 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards107
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)82
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions46
IASignal failure (including no fault found)16
ZUNo Cause Identified After investigation by both Parties12
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.11
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)8
Q1Takeback Pumps7
Q3NZ Pumps T6
MPRail / wheel interface, adhesion problems (including ice on the running rail)5
Since 2018
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions3,140
ZUNo Cause Identified After investigation by both Parties1,103
MDTechnical failures below the solebar1,075
TGDriver800
MNBrake and brake systems faults; including wheel flats where no other cause had been identified605
M8Technical failures above the Solebar593
MCDiesel Loco failure, defect, attention532
IBPoints failure (including no fault found)454
I0Telecom equipment legacy radio failures (RETB)432
MLWagons, coaches and parcel vehicle faults280