Redhill
2,192 delay minutes
The biggest share (41%) of the delay picked up at Redhill in the four weeks to 9 December 2023 came from how the network was run.
77% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 136 | 6% | 8% | 5 a day, more than 3 of the other 4 years | 2 |
| Signals, points and power | 323 | 15% | 16% | 12 a day, more than 2 of the other 4 years | 7 |
| Weather and structures | 37 | 2% | 7% | 1 a day, more than 2 of the other 4 years | 3 |
| Autumn | 24 | 1% | 7% | 1 a day, the least in 5 years | - |
| External | 81 | 4% | 4% | 3 a day, more than 3 of the other 4 years | 6 |
| Network management | 888 | 41% | 17% | 32 a day, more than 1 of the other 4 years | 11 |
| The operators' causes | |||||
| Train faults | 214 | 10% | 16% | 8 a day, more than 1 of the other 4 years | 24 |
| Traincrew | 237 | 11% | 11% | 8 a day, more than 1 of the other 4 years | 12 |
| Stations | 70 | 3% | 3% | 3 a day, more than 1 of the other 4 years | - |
| Operations | 59 | 3% | 5% | 2 a day, more than 1 of the other 4 years | - |
| Operator, other | 123 | 6% | 7% | 4 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 237 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 195 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 183 |
| TG | Driver | 179 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 120 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 90 |
| II | Signalling lineside cable fault | 76 |
| OB | Delayed by signaller not applying applicable regulating policy | 76 |
| IB | Points failure (including no fault found) | 75 |
| M8 | Technical failures above the Solebar | 75 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 12,587 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 11,104 |
| IC | Track circuit failure (including no fault found) | 8,714 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 8,634 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6,709 |
| OB | Delayed by signaller not applying applicable regulating policy | 5,787 |
| IB | Points failure (including no fault found) | 4,951 |
| M8 | Technical failures above the Solebar | 4,434 |
| TI | Traincrew rostering problem | 3,806 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,441 |