Reigate
840 delay minutes
The biggest share (32%) of the delay picked up at Reigate in the four weeks to 9 December 2023 came from how the network was run.
83% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 55 | 7% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 176 | 21% | 16% | 6 a day, the least in 5 years | 1 |
| Weather and structures | 11 | 1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 32 | 4% | 7% | 1 a day, the least in 5 years | - |
| External | 32 | 4% | 4% | 1 a day, the most in 5 years | - |
| Network management | 271 | 32% | 17% | 10 a day, more than 1 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 90 | 11% | 16% | 3 a day, more than 2 of the other 4 years | - |
| Traincrew | 54 | 6% | 11% | 2 a day, the least in 5 years | 1 |
| Stations | 45 | 5% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 9 | 1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 65 | 8% | 7% | 2 a day, the least in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 96 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 72 |
| IB | Points failure (including no fault found) | 63 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 49 |
| TG | Driver | 48 |
| IK | Telecom equipment failure (including no fault found) | 39 |
| II | Signalling lineside cable fault | 37 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 33 |
| Q3 | NZ Pumps T | 32 |
| TT | Leaf fall Neutral | 32 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 4,436 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 4,396 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 4,315 |
| IC | Track circuit failure (including no fault found) | 3,721 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,976 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 2,729 |
| IB | Points failure (including no fault found) | 2,267 |
| OB | Delayed by signaller not applying applicable regulating policy | 2,266 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,912 |
| M8 | Technical failures above the Solebar | 1,523 |