Retford
2,061 delay minutes
Most of the delay picked up at Retford in the four weeks to 9 December 2023 came from signal, points and power faults.
25% of these minutes were knock-on from something that happened elsewhere first. 65% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 86 | 4% | 8% | 3 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 1,275 | 62% | 16% | 46 a day, the most in 5 years | 4 |
| Weather and structures | 160 | 8% | 7% | 6 a day, the most in 5 years | - |
| Autumn | 42 | 2% | 7% | 2 a day, the most in 5 years | - |
| External | 23 | 1% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 139 | 7% | 17% | 5 a day, more than 2 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 201 | 10% | 16% | 7 a day, more than 3 of the other 4 years | 1 |
| Traincrew | 75 | 4% | 11% | 3 a day, the most in 5 years | 1 |
| Stations | 17 | <1% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 32 | 2% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 11 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I1 | Overhead line/third rail defect | 628 |
| II | Signalling lineside cable fault | 419 |
| I2 | AC/DC trip (including no fault or cause found) | 189 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 122 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 112 |
| TG | Driver | 69 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 66 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 47 |
| OU | Delays not Investigated by Network Rail | 39 |
| QJ | Special working for leaf-fall track circuit operation | 38 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 5,319 |
| I1 | Overhead line/third rail defect | 3,815 |
| IC | Track circuit failure (including no fault found) | 3,172 |
| MB | Electic Loco failure, defect, attention | 3,053 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 3,047 |
| MD | Technical failures below the solebar | 2,920 |
| II | Signalling lineside cable fault | 2,634 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 2,092 |
| XR | Cable vandalism or theft | 1,989 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,983 |