Leaves on the Line

Retford

RET East Coast route
CSV JSON

2,061 delay minutes

Most of the delay picked up at Retford in the four weeks to 9 December 2023 came from signal, points and power faults.

25% of these minutes were knock-on from something that happened elsewhere first. 65% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track864%8% 3 a day, more than 1 of the other 4 years-
Signals, points and power1,27562%16% 46 a day, the most in 5 years4
Weather and structures1608%7% 6 a day, the most in 5 years-
Autumn422%7% 2 a day, the most in 5 years-
External231%4% 1 a day, more than 1 of the other 4 years-
Network management1397%17% 5 a day, more than 2 of the other 4 years1
The operators' causes
Train faults20110%16% 7 a day, more than 3 of the other 4 years1
Traincrew754%11% 3 a day, the most in 5 years1
Stations17<1%3% 1 a day, more than 2 of the other 4 years-
Operations322%5% 1 a day, more than 3 of the other 4 years-
Operator, other11<1%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I1Overhead line/third rail defect628
IISignalling lineside cable fault419
I2AC/DC trip (including no fault or cause found)189
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail122
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)112
TGDriver69
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.66
I8Animal Strike or Incursion within the control of Network Rail47
OUDelays not Investigated by Network Rail39
QJSpecial working for leaf-fall track circuit operation38
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)5,319
I1Overhead line/third rail defect3,815
ICTrack circuit failure (including no fault found)3,172
MBElectic Loco failure, defect, attention3,053
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)3,047
MDTechnical failures below the solebar2,920
IISignalling lineside cable fault2,634
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail2,092
XRCable vandalism or theft1,989
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,983