874 delay minutes

The biggest share (44%) of the delay picked up at Rhyl in the four weeks to 9 December 2023 came from signal, points and power faults.

24% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3<1%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power38644%16% 14 a day, the most in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn566%7% 2 a day, the most in 5 years-
External577%4% 2 a day, more than 3 of the other 4 years-
Network management748%17% 3 a day, more than 3 of the other 4 years-
The operators' causes
Train faults13215%16% 5 a day, more than 3 of the other 4 years2
Traincrew769%11% 3 a day, more than 3 of the other 4 years-
Stations839%3% 3 a day, the most in 5 years-
Operations4<1%5% 0 a day, more than 1 of the other 4 years-
Operator, other3<1%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)149
IBPoints failure (including no fault found)117
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps70
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure61
T2Delay at unstaffed station to non-DOO train61
QICautioning due to railhead leaf contamination53
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)43
TGDriver36
IASignal failure (including no fault found)33
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)27
Since 2018
CodeWhat Network Rail loggedMinutes
T2Delay at unstaffed station to non-DOO train5,036
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,408
MDTechnical failures below the solebar2,148
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,782
TGDriver1,341
OUDelays not Investigated by Network Rail1,129
TH(Senior) Conductor/Train Manager1,065
IISignalling lineside cable fault1,037
M8Technical failures above the Solebar1,019
IKTelecom equipment failure (including no fault found)982