Rhyl
874 delay minutes
The biggest share (44%) of the delay picked up at Rhyl in the four weeks to 9 December 2023 came from signal, points and power faults.
24% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | <1% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 386 | 44% | 16% | 14 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 56 | 6% | 7% | 2 a day, the most in 5 years | - |
| External | 57 | 7% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 74 | 8% | 17% | 3 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 132 | 15% | 16% | 5 a day, more than 3 of the other 4 years | 2 |
| Traincrew | 76 | 9% | 11% | 3 a day, more than 3 of the other 4 years | - |
| Stations | 83 | 9% | 3% | 3 a day, the most in 5 years | - |
| Operations | 4 | <1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 3 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 149 |
| IB | Points failure (including no fault found) | 117 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 70 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 61 |
| T2 | Delay at unstaffed station to non-DOO train | 61 |
| QI | Cautioning due to railhead leaf contamination | 53 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 43 |
| TG | Driver | 36 |
| IA | Signal failure (including no fault found) | 33 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 27 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 5,036 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,408 |
| MD | Technical failures below the solebar | 2,148 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,782 |
| TG | Driver | 1,341 |
| OU | Delays not Investigated by Network Rail | 1,129 |
| TH | (Senior) Conductor/Train Manager | 1,065 |
| II | Signalling lineside cable fault | 1,037 |
| M8 | Technical failures above the Solebar | 1,019 |
| IK | Telecom equipment failure (including no fault found) | 982 |