Rutherglen
12 delay minutes
Most of the delay picked up at Rutherglen in the four weeks to 9 December 2023 came from weather and structures.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | 2 |
| Weather and structures | 12 | 100% | 7% | 1 |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 136 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 99 |
| QA | WTT schedule and or LTP Process including erroneous simplifiers | 90 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 90 |
| IB | Points failure (including no fault found) | 74 |
| M8 | Technical failures above the Solebar | 53 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 52 |
| TG | Driver | 50 |
| OU | Delays not Investigated by Network Rail | 48 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 45 |