12 delay minutes

Most of the delay picked up at Rutherglen in the four weeks to 9 December 2023 came from weather and structures.

100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%2
Weather and structures12100%7%1
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed12
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)136
X8Animal Strike or incursion not within the control of Network Rail99
QAWTT schedule and or LTP Process including erroneous simplifiers90
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)90
IBPoints failure (including no fault found)74
M8Technical failures above the Solebar53
MNBrake and brake systems faults; including wheel flats where no other cause had been identified52
TGDriver50
OUDelays not Investigated by Network Rail48
OCSignaller including mis-routing (not ERTM /ETCS related)45