Royston
2,405 delay minutes
The biggest share (36%) of the delay picked up at Royston in the four weeks to 9 December 2023 came from how the network was run.
66% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 135 | 6% | 8% | 5 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 287 | 12% | 16% | 10 a day, more than 3 of the other 4 years | 2 |
| Weather and structures | 37 | 2% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 62 | 3% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | 132 | 5% | 4% | 5 a day, more than 2 of the other 4 years | 1 |
| Network management | 873 | 36% | 17% | 31 a day, the most in 5 years | 8 |
| The operators' causes | |||||
| Train faults | 201 | 8% | 16% | 7 a day, more than 3 of the other 4 years | 4 |
| Traincrew | 410 | 17% | 11% | 15 a day, more than 3 of the other 4 years | 5 |
| Stations | 68 | 3% | 3% | 2 a day, the most in 5 years | - |
| Operations | 53 | 2% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 148 | 6% | 7% | 5 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 327 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 265 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 215 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 184 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 117 |
| XP | BRIDGE HIT | 88 |
| M7 | Door and Door system faults | 81 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 77 |
| OU | Delays not Investigated by Network Rail | 74 |
| MU | Depot operating problem | 73 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 17,284 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 11,380 |
| M8 | Technical failures above the Solebar | 5,608 |
| TI | Traincrew rostering problem | 5,575 |
| I1 | Overhead line/third rail defect | 4,032 |
| IC | Track circuit failure (including no fault found) | 3,673 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,612 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,234 |
| IB | Points failure (including no fault found) | 3,179 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,861 |