1,642 delay minutes

The biggest share (35%) of the delay picked up at South Croydon in the four weeks to 9 December 2023 came from how the network was run.

70% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track312%8% 1 a day, the most in 5 years-
Signals, points and power45228%16% 16 a day, the most in 5 years1
Weather and structures191%7% 1 a day, the most in 5 years-
Autumn362%7% 1 a day, the most in 5 years-
External1036%4% 4 a day, the most in 5 years-
Network management56835%17% 20 a day, the most in 5 years-
The operators' causes
Train faults956%16% 3 a day, the most in 5 years-
Traincrew16710%11% 6 a day, the most in 5 years-
Stations382%3% 1 a day, the most in 5 years-
Operations221%5% 1 a day, the most in 5 years-
Operator, other1117%7% 4 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)306
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)249
OCSignaller including mis-routing (not ERTM /ETCS related)144
TGDriver126
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)66
VHPassenger Communication cord, door egress or emergency train alarm operated56
OBDelayed by signaller not applying applicable regulating policy51
MYCoupler, Coupler system and Jumper cable faults40
IISignalling lineside cable fault37
Q3NZ Pumps T36
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,312
OCSignaller including mis-routing (not ERTM /ETCS related)1,649
ICTrack circuit failure (including no fault found)1,371
TGDriver1,125
OBDelayed by signaller not applying applicable regulating policy802
IBPoints failure (including no fault found)711
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)518
IRBroken/cracked/twisted/buckled/flawed rail457
M8Technical failures above the Solebar312
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure298