South Croydon
1,642 delay minutes
The biggest share (35%) of the delay picked up at South Croydon in the four weeks to 9 December 2023 came from how the network was run.
70% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 31 | 2% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 452 | 28% | 16% | 16 a day, the most in 5 years | 1 |
| Weather and structures | 19 | 1% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 36 | 2% | 7% | 1 a day, the most in 5 years | - |
| External | 103 | 6% | 4% | 4 a day, the most in 5 years | - |
| Network management | 568 | 35% | 17% | 20 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 95 | 6% | 16% | 3 a day, the most in 5 years | - |
| Traincrew | 167 | 10% | 11% | 6 a day, the most in 5 years | - |
| Stations | 38 | 2% | 3% | 1 a day, the most in 5 years | - |
| Operations | 22 | 1% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 111 | 7% | 7% | 4 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 306 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 249 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 144 |
| TG | Driver | 126 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 66 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 56 |
| OB | Delayed by signaller not applying applicable regulating policy | 51 |
| MY | Coupler, Coupler system and Jumper cable faults | 40 |
| II | Signalling lineside cable fault | 37 |
| Q3 | NZ Pumps T | 36 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,312 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,649 |
| IC | Track circuit failure (including no fault found) | 1,371 |
| TG | Driver | 1,125 |
| OB | Delayed by signaller not applying applicable regulating policy | 802 |
| IB | Points failure (including no fault found) | 711 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 518 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 457 |
| M8 | Technical failures above the Solebar | 312 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 298 |