Leaves on the Line

Shieldmuir

SDM Scotland route
CSV JSON

14 delay minutes

Most of the delay picked up at Shieldmuir in the four weeks to 9 December 2023 came from faulty trains.

100% of these minutes were knock-on from something that happened elsewhere first. 0% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults14100%16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)14
Since 2018
CodeWhat Network Rail loggedMinutes
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)14
M8Technical failures above the Solebar10
MNBrake and brake systems faults; including wheel flats where no other cause had been identified9
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)6
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure5
FOTime Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility)2