Sandy
2,008 delay minutes
The biggest share (37%) of the delay picked up at Sandy in the four weeks to 9 December 2023 came from track faults.
24% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 738 | 37% | 8% | 26 a day, the most in 5 years | - |
| Signals, points and power | 325 | 16% | 16% | 12 a day, more than 3 of the other 4 years | - |
| Weather and structures | 314 | 16% | 7% | 11 a day, the most in 5 years | - |
| Autumn | 21 | 1% | 7% | 1 a day, the least in 5 years | - |
| External | 78 | 4% | 4% | 3 a day, more than 2 of the other 4 years | - |
| Network management | 186 | 9% | 17% | 7 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 190 | 9% | 16% | 7 a day, more than 1 of the other 4 years | - |
| Traincrew | 108 | 5% | 11% | 4 a day, more than 1 of the other 4 years | - |
| Stations | 11 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 19 | <1% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 20 | <1% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 738 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 308 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 129 |
| IE | Signalling Functional Power Supply Failure | 118 |
| I1 | Overhead line/third rail defect | 73 |
| TG | Driver | 73 |
| XP | BRIDGE HIT | 67 |
| II | Signalling lineside cable fault | 47 |
| OU | Delays not Investigated by Network Rail | 45 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 44 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 6,247 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6,103 |
| I1 | Overhead line/third rail defect | 5,987 |
| IA | Signal failure (including no fault found) | 3,598 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 3,481 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 3,253 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,094 |
| IB | Points failure (including no fault found) | 2,506 |
| IC | Track circuit failure (including no fault found) | 2,187 |
| M8 | Technical failures above the Solebar | 2,176 |