Seaford
294 delay minutes
The biggest share (44%) of the delay picked up at Seaford in the four weeks to 9 December 2023 came from how the network was run.
85% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 4 | 1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 31 | 11% | 16% | 1 a day, more than 1 of the other 4 years | 1 |
| Weather and structures | 24 | 8% | 7% | 1 a day, more than 2 of the other 4 years | 3 |
| Autumn | 2 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | 10 | 3% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 129 | 44% | 17% | 5 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 26 | 9% | 16% | 1 a day, more than 2 of the other 4 years | 2 |
| Traincrew | 63 | 21% | 11% | 2 a day, more than 3 of the other 4 years | - |
| Stations | 3 | 1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 2 | <1% | 7% | 0 a day, the least in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 57 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 53 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 40 |
| OM | Technical failure associated with a Railhead conditioning train | 22 |
| M8 | Technical failures above the Solebar | 16 |
| JK | Flooding not due to exceptional weather | 14 |
| IG | Block failure | 13 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 10 |
| J0 | Telecom equipment radio failure (GSM-R) | 9 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 2,944 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,019 |
| TG | Driver | 1,825 |
| IC | Track circuit failure (including no fault found) | 1,583 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,023 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 797 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 559 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 502 |
| TI | Traincrew rostering problem | 484 |
| M8 | Technical failures above the Solebar | 409 |