294 delay minutes

The biggest share (44%) of the delay picked up at Seaford in the four weeks to 9 December 2023 came from how the network was run.

85% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track41%8% 0 a day, the least in 5 years-
Signals, points and power3111%16% 1 a day, more than 1 of the other 4 years1
Weather and structures248%7% 1 a day, more than 2 of the other 4 years3
Autumn2<1%7% 0 a day, more than 1 of the other 4 years-
External103%4% 0 a day, more than 2 of the other 4 years-
Network management12944%17% 5 a day, more than 2 of the other 4 years-
The operators' causes
Train faults269%16% 1 a day, more than 2 of the other 4 years2
Traincrew6321%11% 2 a day, more than 3 of the other 4 years-
Stations31%3% 0 a day, more than 1 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other2<1%7% 0 a day, the least in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver57
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)53
OCSignaller including mis-routing (not ERTM /ETCS related)40
OMTechnical failure associated with a Railhead conditioning train22
M8Technical failures above the Solebar16
JKFlooding not due to exceptional weather14
IGBlock failure13
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)10
J0Telecom equipment radio failure (GSM-R)9
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)8
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)2,944
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,019
TGDriver1,825
ICTrack circuit failure (including no fault found)1,583
OCSignaller including mis-routing (not ERTM /ETCS related)1,023
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.797
R7Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts)559
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure502
TITraincrew rostering problem484
M8Technical failures above the Solebar409