Shrewsbury
7,463 delay minutes
The biggest share (34%) of the delay picked up at Shrewsbury in the four weeks to 9 December 2023 came from faulty trains.
70% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 36 | <1% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 1,074 | 14% | 16% | 38 a day, the most in 5 years | 4 |
| Weather and structures | 126 | 2% | 7% | 5 a day, the least in 5 years | 1 |
| Autumn | 657 | 9% | 7% | 23 a day, the most in 5 years | 3 |
| External | 222 | 3% | 4% | 8 a day, more than 3 of the other 4 years | 1 |
| Network management | 855 | 11% | 17% | 31 a day, more than 2 of the other 4 years | 83 |
| The operators' causes | |||||
| Train faults | 2,549 | 34% | 16% | 91 a day, the most in 5 years | 29 |
| Traincrew | 1,092 | 15% | 11% | 39 a day, more than 3 of the other 4 years | 3 |
| Stations | 239 | 3% | 3% | 9 a day, more than 3 of the other 4 years | - |
| Operations | 418 | 6% | 5% | 15 a day, more than 3 of the other 4 years | 8 |
| Operator, other | 197 | 3% | 7% | 7 a day, more than 2 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 807 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 787 |
| QI | Cautioning due to railhead leaf contamination | 503 |
| M8 | Technical failures above the Solebar | 498 |
| M9 | Reported fleet equipment defect - no fault found | 388 |
| M7 | Door and Door system faults | 386 |
| TZ | Other Passenger Train Operating Company causes | 321 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 240 |
| MD | Technical failures below the solebar | 159 |
| JT | Points failure caused by snow or frost where heaters are not fitted | 144 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 21,680 |
| TG | Driver | 19,169 |
| M8 | Technical failures above the Solebar | 13,979 |
| MD | Technical failures below the solebar | 13,964 |
| TZ | Other Passenger Train Operating Company causes | 9,204 |
| TH | (Senior) Conductor/Train Manager | 7,552 |
| M9 | Reported fleet equipment defect - no fault found | 6,462 |
| OU | Delays not Investigated by Network Rail | 6,261 |
| M7 | Door and Door system faults | 5,743 |
| ZY | Univestigated station overtime System Roll-up Only | 5,431 |