Shepherds Bush
86 delay minutes
Most of the delay picked up at Shepherds Bush in the four weeks to 9 December 2023 came from track faults.
60% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 64 | 74% | 8% | 7 |
| Signals, points and power | 9 | 10% | 16% | 6 |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 5 | 6% | 17% | 4 |
| The operators' causes | ||||
| Train faults | 3 | 3% | 16% | 3 |
| Traincrew | - | - | 11% | 3 |
| Stations | - | - | 3% | 1 |
| Operations | 5 | 6% | 5% | 4 |
| Operator, other | - | - | 7% | 1 |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 64 |
| IH | Power Supply And Distribution System Failure | 9 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 5 |
| M8 | Technical failures above the Solebar | 3 |
| OB | Delayed by signaller not applying applicable regulating policy | 3 |
| OR | LOM directive or Signaller correctly applying local instructions (ex late running trains or infrastructure Accepted Limitation) | 2 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 583 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 259 |
| I2 | AC/DC trip (including no fault or cause found) | 259 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 202 |
| IB | Points failure (including no fault found) | 200 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 138 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 132 |
| QM | Train schedule/STP Process including erroneous simplifiers | 128 |
| I9 | Fires starting on Network Rail Infrastructure | 123 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 103 |