Leaves on the Line

Springburn

SPR Scotland route
CSV JSON

906 delay minutes

The biggest share (23%) of the delay picked up at Springburn in the four weeks to 9 December 2023 came from other operator causes.

79% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track364%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power546%16% 2 a day, the least in 5 years7
Weather and structures597%7% 2 a day, more than 3 of the other 4 years-
Autumn18921%7% 7 a day, the most in 5 years-
External111%4% 0 a day, more than 1 of the other 4 years-
Network management11413%17% 4 a day, more than 1 of the other 4 years-
The operators' causes
Train faults849%16% 3 a day, more than 2 of the other 4 years3
Traincrew768%11% 3 a day, more than 2 of the other 4 years2
Stations374%3% 1 a day, more than 3 of the other 4 years-
Operations394%5% 1 a day, more than 1 of the other 4 years-
Operator, other20823%7% 7 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T168
MPRail / wheel interface, adhesion problems (including ice on the running rail)142
TGDriver59
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)52
M8Technical failures above the Solebar35
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)32
TTLeaf fall Neutral29
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed27
RQUn-booked assistance for a person with reduced mobility joining/alighting,23
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.20
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)5,455
TGDriver3,335
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)3,127
M8Technical failures above the Solebar1,818
Q3NZ Pumps T1,778
MPRail / wheel interface, adhesion problems (including ice on the running rail)1,512
IBPoints failure (including no fault found)1,199
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,199
MDTechnical failures below the solebar1,107
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,012