2,924 delay minutes

The biggest share (43%) of the delay picked up at Selhurst in the four weeks to 9 December 2023 came from how the network was run.

84% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1104%8% 4 a day, the least in 5 years-
Signals, points and power62721%16% 22 a day, more than 1 of the other 4 years6
Weather and structures743%7% 3 a day, more than 3 of the other 4 years-
Autumn11<1%7% 0 a day, the least in 5 years-
External823%4% 3 a day, more than 1 of the other 4 years7
Network management1,25043%17% 45 a day, more than 2 of the other 4 years-
The operators' causes
Train faults29710%16% 11 a day, more than 1 of the other 4 years4
Traincrew2629%11% 9 a day, the least in 5 years2
Stations632%3% 2 a day, more than 2 of the other 4 years-
Operations22<1%5% 1 a day, the least in 5 years-
Operator, other1274%7% 5 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)416
OBDelayed by signaller not applying applicable regulating policy251
TGDriver232
IISignalling lineside cable fault204
OCSignaller including mis-routing (not ERTM /ETCS related)193
IBPoints failure (including no fault found)112
J3Axle Counter Failure98
VHPassenger Communication cord, door egress or emergency train alarm operated92
I6Delays as a result of line blocks / track patrols (including late handback)83
M8Technical failures above the Solebar71
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)28,797
TGDriver21,006
OCSignaller including mis-routing (not ERTM /ETCS related)18,351
OBDelayed by signaller not applying applicable regulating policy17,723
ICTrack circuit failure (including no fault found)9,580
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.9,198
IRBroken/cracked/twisted/buckled/flawed rail7,472
M8Technical failures above the Solebar5,942
VHPassenger Communication cord, door egress or emergency train alarm operated5,807
IBPoints failure (including no fault found)4,650