The biggest share (29%) of the delay picked up at Shoreham-by-Sea (Sussex) in the four weeks to 9 December 2023 came from how the network was run.

59% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track165%8% 1 a day, the most in 5 years-
Signals, points and power3311%16% 1 a day, the least in 5 years-
Weather and structures72%7% 0 a day, more than 2 of the other 4 years-
Autumn83%7% 0 a day, more than 1 of the other 4 years-
External3511%4% 1 a day, the most in 5 years-
Network management9029%17% 3 a day, the least in 5 years-
The operators' causes
Train faults62%16% 0 a day, the least in 5 years-
Traincrew7223%11% 3 a day, more than 1 of the other 4 years-
Stations3010%3% 1 a day, more than 3 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other103%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver63
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)51
IISignalling lineside cable fault24
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)24
OCSignaller including mis-routing (not ERTM /ETCS related)21
RQUn-booked assistance for a person with reduced mobility joining/alighting,17
RBPassengers joining/alighting13
J5Infrastructure Asset fault reported but proven to be mistaken9
TWDriver adhering to company professional driving standards or policy9
IRBroken/cracked/twisted/buckled/flawed rail8
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4,119
TGDriver3,409
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,153
OCSignaller including mis-routing (not ERTM /ETCS related)910
MDTechnical failures below the solebar798
ICTrack circuit failure (including no fault found)672
VHPassenger Communication cord, door egress or emergency train alarm operated626
M8Technical failures above the Solebar561
RQUn-booked assistance for a person with reduced mobility joining/alighting,500
IBPoints failure (including no fault found)497