Leaves on the Line

Strathcarron

STC Scotland route
CSV JSON

36 delay minutes

The biggest share (18%) of the delay picked up at Strathcarron in the four weeks to 9 December 2023 came from how the network was run.

22% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track38%8%-
Signals, points and power--16%-
Weather and structures411%7%-
Autumn411%7%-
External--4%-
Network management718%17%-
The operators' causes
Train faults617%16%-
Traincrew718%11%-
Stations26%3%-
Operations--5%-
Operator, other411%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver7
MDTechnical failures below the solebar6
ZUNo Cause Identified After investigation by both Parties5
MPRail / wheel interface, adhesion problems (including ice on the running rail)4
Q3NZ Pumps T4
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)2
RBPassengers joining/alighting2
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions2
Q1Takeback Pumps2
Since 2018
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,221
ZUNo Cause Identified After investigation by both Parties918
MDTechnical failures below the solebar432
TGDriver388
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure335
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail266
RBPassengers joining/alighting227
I0Telecom equipment legacy radio failures (RETB)216
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)185
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)160