Strathcarron
36 delay minutes
The biggest share (18%) of the delay picked up at Strathcarron in the four weeks to 9 December 2023 came from how the network was run.
22% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 3 | 8% | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | 4 | 11% | 7% | - |
| Autumn | 4 | 11% | 7% | - |
| External | - | - | 4% | - |
| Network management | 7 | 18% | 17% | - |
| The operators' causes | ||||
| Train faults | 6 | 17% | 16% | - |
| Traincrew | 7 | 18% | 11% | - |
| Stations | 2 | 6% | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 4 | 11% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 7 |
| MD | Technical failures below the solebar | 6 |
| ZU | No Cause Identified After investigation by both Parties | 5 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 4 |
| Q3 | NZ Pumps T | 4 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 2 |
| RB | Passengers joining/alighting | 2 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 2 |
| Q1 | Takeback Pumps | 2 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,221 |
| ZU | No Cause Identified After investigation by both Parties | 918 |
| MD | Technical failures below the solebar | 432 |
| TG | Driver | 388 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 335 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 266 |
| RB | Passengers joining/alighting | 227 |
| I0 | Telecom equipment legacy radio failures (RETB) | 216 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 185 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 160 |