0 delay minutes

No delay was picked up at Stranraer in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power--16% 0 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management--17% 0 a day, the least in 5 years1
The operators' causes
Train faults--16% 0 a day, the least in 5 years-
Traincrew--11% 0 a day, the least in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other--7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)1,623
ZUNo Cause Identified After investigation by both Parties1,435
MDTechnical failures below the solebar908
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions634
TGDriver489
IKTelecom equipment failure (including no fault found)487
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure407
IASignal failure (including no fault found)311
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)292
M8Technical failures above the Solebar278