Sunderland
789 delay minutes
The biggest share (21%) of the delay picked up at Sunderland in the four weeks to 9 December 2023 came from the operators' own operations.
71% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 27 | 3% | 8% | 1 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 103 | 13% | 16% | 4 a day, the most in 5 years | 2 |
| Weather and structures | 39 | 5% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 7 | <1% | 7% | 0 a day, the least in 5 years | - |
| External | 71 | 9% | 4% | 3 a day, more than 3 of the other 4 years | - |
| Network management | 136 | 17% | 17% | 5 a day, the most in 5 years | 11 |
| The operators' causes | |||||
| Train faults | 144 | 18% | 16% | 5 a day, the most in 5 years | 3 |
| Traincrew | 24 | 3% | 11% | 1 a day, the least in 5 years | - |
| Stations | 48 | 6% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 169 | 21% | 5% | 6 a day, the most in 5 years | - |
| Operator, other | 21 | 3% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TZ | Other Passenger Train Operating Company causes | 146 |
| M8 | Technical failures above the Solebar | 107 |
| OU | Delays not Investigated by Network Rail | 87 |
| XP | BRIDGE HIT | 55 |
| IB | Points failure (including no fault found) | 43 |
| J0 | Telecom equipment radio failure (GSM-R) | 41 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 30 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 30 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 27 |
| RB | Passengers joining/alighting | 18 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 3,423 |
| TZ | Other Passenger Train Operating Company causes | 2,663 |
| MD | Technical failures below the solebar | 2,025 |
| TG | Driver | 1,616 |
| IB | Points failure (including no fault found) | 1,284 |
| RB | Passengers joining/alighting | 993 |
| IC | Track circuit failure (including no fault found) | 677 |
| M8 | Technical failures above the Solebar | 661 |
| XB | Vandalism or theft (including the placing of objects on the line) | 648 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 642 |