Stevenage
1,987 delay minutes
The biggest share (26%) of the delay picked up at Stevenage in the four weeks to 9 December 2023 came from traincrew problems.
72% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 142 | 7% | 8% | 5 a day, the least in 5 years | - |
| Signals, points and power | 103 | 5% | 16% | 4 a day, the least in 5 years | 1 |
| Weather and structures | 88 | 4% | 7% | 3 a day, more than 3 of the other 4 years | - |
| Autumn | 109 | 5% | 7% | 4 a day, more than 3 of the other 4 years | - |
| External | 98 | 5% | 4% | 4 a day, more than 2 of the other 4 years | - |
| Network management | 486 | 24% | 17% | 17 a day, more than 3 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 252 | 13% | 16% | 9 a day, the least in 5 years | 12 |
| Traincrew | 514 | 26% | 11% | 18 a day, the most in 5 years | 9 |
| Stations | 28 | 1% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 75 | 4% | 5% | 3 a day, more than 3 of the other 4 years | - |
| Operator, other | 93 | 5% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 288 |
| TI | Traincrew rostering problem | 173 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 113 |
| OU | Delays not Investigated by Network Rail | 105 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 89 |
| MU | Depot operating problem | 68 |
| XP | BRIDGE HIT | 68 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 66 |
| M7 | Door and Door system faults | 63 |
| M8 | Technical failures above the Solebar | 58 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 14,185 |
| M8 | Technical failures above the Solebar | 6,568 |
| I1 | Overhead line/third rail defect | 6,478 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6,433 |
| TI | Traincrew rostering problem | 5,972 |
| IB | Points failure (including no fault found) | 4,198 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,085 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 4,070 |
| IA | Signal failure (including no fault found) | 3,482 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3,183 |