Swansea
4,841 delay minutes
The biggest share (35%) of the delay picked up at Swansea in the four weeks to 9 December 2023 came from faulty trains.
68% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 274 | 6% | 8% | 10 a day, the most in 5 years | 1 |
| Signals, points and power | 622 | 13% | 16% | 22 a day, the most in 5 years | 4 |
| Weather and structures | 237 | 5% | 7% | 8 a day, more than 3 of the other 4 years | 2 |
| Autumn | 77 | 2% | 7% | 3 a day, the most in 5 years | - |
| External | 70 | 1% | 4% | 3 a day, more than 2 of the other 4 years | - |
| Network management | 267 | 6% | 17% | 10 a day, more than 2 of the other 4 years | 80 |
| The operators' causes | |||||
| Train faults | 1,694 | 35% | 16% | 61 a day, the most in 5 years | 39 |
| Traincrew | 903 | 19% | 11% | 32 a day, the most in 5 years | 17 |
| Stations | 155 | 3% | 3% | 6 a day, the most in 5 years | 2 |
| Operations | 493 | 10% | 5% | 18 a day, the most in 5 years | 3 |
| Operator, other | 49 | 1% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 828 |
| TG | Driver | 536 |
| TZ | Other Passenger Train Operating Company causes | 349 |
| M8 | Technical failures above the Solebar | 286 |
| TH | (Senior) Conductor/Train Manager | 237 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 233 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 189 |
| IC | Track circuit failure (including no fault found) | 181 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 141 |
| II | Signalling lineside cable fault | 132 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 9,188 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 7,719 |
| MD | Technical failures below the solebar | 6,132 |
| M8 | Technical failures above the Solebar | 5,046 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 4,856 |
| IB | Points failure (including no fault found) | 3,843 |
| TH | (Senior) Conductor/Train Manager | 3,372 |
| TZ | Other Passenger Train Operating Company causes | 3,020 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 2,761 |
| M9 | Reported fleet equipment defect - no fault found | 2,404 |