4,841 delay minutes

The biggest share (35%) of the delay picked up at Swansea in the four weeks to 9 December 2023 came from faulty trains.

68% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2746%8% 10 a day, the most in 5 years1
Signals, points and power62213%16% 22 a day, the most in 5 years4
Weather and structures2375%7% 8 a day, more than 3 of the other 4 years2
Autumn772%7% 3 a day, the most in 5 years-
External701%4% 3 a day, more than 2 of the other 4 years-
Network management2676%17% 10 a day, more than 2 of the other 4 years80
The operators' causes
Train faults1,69435%16% 61 a day, the most in 5 years39
Traincrew90319%11% 32 a day, the most in 5 years17
Stations1553%3% 6 a day, the most in 5 years2
Operations49310%5% 18 a day, the most in 5 years3
Operator, other491%7% 2 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps828
TGDriver536
TZOther Passenger Train Operating Company causes349
M8Technical failures above the Solebar286
TH(Senior) Conductor/Train Manager237
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure233
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.189
ICTrack circuit failure (including no fault found)181
MNBrake and brake systems faults; including wheel flats where no other cause had been identified141
IISignalling lineside cable fault132
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver9,188
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps7,719
MDTechnical failures below the solebar6,132
M8Technical failures above the Solebar5,046
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)4,856
IBPoints failure (including no fault found)3,843
TH(Senior) Conductor/Train Manager3,372
TZOther Passenger Train Operating Company causes3,020
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure2,761
M9Reported fleet equipment defect - no fault found2,404