382 delay minutes
The biggest share (30%) of the delay picked up at Tattenham Corner in the four weeks to 9 December 2023 came from how the network was run.
80% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 25 | 7% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 78 | 20% | 16% | 3 a day, the most in 5 years | 1 |
| Weather and structures | 30 | 8% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 19 | 5% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 5 | 1% | 4% | 0 a day, more than 3 of the other 4 years | 1 |
| Network management | 116 | 30% | 17% | 4 a day, the most in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 15 | 4% | 16% | 1 a day, more than 2 of the other 4 years | 6 |
| Traincrew | 48 | 13% | 11% | 2 a day, more than 1 of the other 4 years | 2 |
| Stations | 5 | 1% | 3% | 0 a day, the most in 5 years | - |
| Operations | 10 | 3% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 31 | 8% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 48 |
| II | Signalling lineside cable fault | 44 |
| TG | Driver | 31 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 25 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 20 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 19 |
| Q3 | NZ Pumps T | 19 |
| TT | Leaf fall Neutral | 19 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 17 |
| I1 | Overhead line/third rail defect | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,036 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,109 |
| T3 | Waiting connections from other transport modes | 1,013 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 811 |
| IC | Track circuit failure (including no fault found) | 562 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 378 |
| II | Signalling lineside cable fault | 371 |
| OB | Delayed by signaller not applying applicable regulating policy | 367 |
| TT | Leaf fall Neutral | 355 |
| TI | Traincrew rostering problem | 333 |