Leaves on the Line

Taynuilt

TAY Scotland route
CSV JSON

921 delay minutes

The biggest share (31%) of the delay picked up at Taynuilt in the four weeks to 9 December 2023 came from how the network was run.

54% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track273%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power758%16% 3 a day, the most in 5 years-
Weather and structures22424%7% 8 a day, more than 3 of the other 4 years-
Autumn556%7% 2 a day, the most in 5 years-
External505%4% 2 a day, the most in 5 years-
Network management28831%17% 10 a day, the most in 5 years-
The operators' causes
Train faults10912%16% 4 a day, more than 3 of the other 4 years-
Traincrew374%11% 1 a day, the most in 5 years-
Stations6<1%3% 0 a day, more than 3 of the other 4 years-
Operations7<1%5% 0 a day, more than 3 of the other 4 years-
Operator, other435%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)196
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions142
IASignal failure (including no fault found)67
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)49
MPRail / wheel interface, adhesion problems (including ice on the running rail)43
MDTechnical failures below the solebar42
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)37
Q3NZ Pumps T36
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)33
Q1Takeback Pumps24
Since 2018
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions6,302
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)2,979
ZUNo Cause Identified After investigation by both Parties2,787
TGDriver2,239
MDTechnical failures below the solebar2,233
M8Technical failures above the Solebar1,325
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.846
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail804
IBPoints failure (including no fault found)785
M0Confirmed train cab based safety system fault (including GSMR)769