Taynuilt
921 delay minutes
The biggest share (31%) of the delay picked up at Taynuilt in the four weeks to 9 December 2023 came from how the network was run.
54% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 27 | 3% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 75 | 8% | 16% | 3 a day, the most in 5 years | - |
| Weather and structures | 224 | 24% | 7% | 8 a day, more than 3 of the other 4 years | - |
| Autumn | 55 | 6% | 7% | 2 a day, the most in 5 years | - |
| External | 50 | 5% | 4% | 2 a day, the most in 5 years | - |
| Network management | 288 | 31% | 17% | 10 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 109 | 12% | 16% | 4 a day, more than 3 of the other 4 years | - |
| Traincrew | 37 | 4% | 11% | 1 a day, the most in 5 years | - |
| Stations | 6 | <1% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 7 | <1% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 43 | 5% | 7% | 2 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 196 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 142 |
| IA | Signal failure (including no fault found) | 67 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 49 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 43 |
| MD | Technical failures below the solebar | 42 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 37 |
| Q3 | NZ Pumps T | 36 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 33 |
| Q1 | Takeback Pumps | 24 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 6,302 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 2,979 |
| ZU | No Cause Identified After investigation by both Parties | 2,787 |
| TG | Driver | 2,239 |
| MD | Technical failures below the solebar | 2,233 |
| M8 | Technical failures above the Solebar | 1,325 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 846 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 804 |
| IB | Points failure (including no fault found) | 785 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 769 |