2,453 delay minutes

The biggest share (29%) of the delay picked up at Three Bridges in the four weeks to 9 December 2023 came from how the network was run.

71% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1366%8% 5 a day, the most in 5 years1
Signals, points and power46019%16% 16 a day, more than 3 of the other 4 years5
Weather and structures1366%7% 5 a day, more than 3 of the other 4 years6
Autumn15<1%7% 1 a day, the least in 5 years-
External1064%4% 4 a day, more than 3 of the other 4 years3
Network management70729%17% 25 a day, the least in 5 years14
The operators' causes
Train faults2018%16% 7 a day, more than 2 of the other 4 years3
Traincrew52421%11% 19 a day, more than 2 of the other 4 years48
Stations853%3% 3 a day, more than 2 of the other 4 years-
Operations653%5% 2 a day, more than 2 of the other 4 years7
Operator, other18<1%7% 1 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)281
TGDriver280
IBPoints failure (including no fault found)167
TITraincrew rostering problem158
M8Technical failures above the Solebar136
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)123
OCSignaller including mis-routing (not ERTM /ETCS related)108
T3Waiting connections from other transport modes84
ICTrack circuit failure (including no fault found)74
IISignalling lineside cable fault73
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver19,370
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)13,936
OCSignaller including mis-routing (not ERTM /ETCS related)11,100
ICTrack circuit failure (including no fault found)10,117
TITraincrew rostering problem8,290
M8Technical failures above the Solebar6,964
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,958
IBPoints failure (including no fault found)5,777
OBDelayed by signaller not applying applicable regulating policy5,750
IRBroken/cracked/twisted/buckled/flawed rail3,815