Three Bridges
2,453 delay minutes
The biggest share (29%) of the delay picked up at Three Bridges in the four weeks to 9 December 2023 came from how the network was run.
71% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 136 | 6% | 8% | 5 a day, the most in 5 years | 1 |
| Signals, points and power | 460 | 19% | 16% | 16 a day, more than 3 of the other 4 years | 5 |
| Weather and structures | 136 | 6% | 7% | 5 a day, more than 3 of the other 4 years | 6 |
| Autumn | 15 | <1% | 7% | 1 a day, the least in 5 years | - |
| External | 106 | 4% | 4% | 4 a day, more than 3 of the other 4 years | 3 |
| Network management | 707 | 29% | 17% | 25 a day, the least in 5 years | 14 |
| The operators' causes | |||||
| Train faults | 201 | 8% | 16% | 7 a day, more than 2 of the other 4 years | 3 |
| Traincrew | 524 | 21% | 11% | 19 a day, more than 2 of the other 4 years | 48 |
| Stations | 85 | 3% | 3% | 3 a day, more than 2 of the other 4 years | - |
| Operations | 65 | 3% | 5% | 2 a day, more than 2 of the other 4 years | 7 |
| Operator, other | 18 | <1% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 281 |
| TG | Driver | 280 |
| IB | Points failure (including no fault found) | 167 |
| TI | Traincrew rostering problem | 158 |
| M8 | Technical failures above the Solebar | 136 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 123 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 108 |
| T3 | Waiting connections from other transport modes | 84 |
| IC | Track circuit failure (including no fault found) | 74 |
| II | Signalling lineside cable fault | 73 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 19,370 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 13,936 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 11,100 |
| IC | Track circuit failure (including no fault found) | 10,117 |
| TI | Traincrew rostering problem | 8,290 |
| M8 | Technical failures above the Solebar | 6,964 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,958 |
| IB | Points failure (including no fault found) | 5,777 |
| OB | Delayed by signaller not applying applicable regulating policy | 5,750 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 3,815 |