Tondu
474 delay minutes
The biggest share (26%) of the delay picked up at Tondu in the four weeks to 9 December 2023 came from faulty trains.
52% of these minutes were knock-on from something that happened elsewhere first. 85% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | 1 |
| Signals, points and power | 64 | 14% | 16% | 2 a day, more than 3 of the other 4 years | 3 |
| Weather and structures | 5 | 1% | 7% | 0 a day, more than 3 of the other 4 years | 1 |
| Autumn | 60 | 13% | 7% | 2 a day, the most in 5 years | 2 |
| External | 12 | 3% | 4% | 0 a day, more than 3 of the other 4 years | - |
| Network management | 36 | 8% | 17% | 1 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 125 | 26% | 16% | 4 a day, the most in 5 years | 4 |
| Traincrew | 98 | 21% | 11% | 4 a day, the most in 5 years | 3 |
| Stations | 42 | 9% | 3% | 2 a day, more than 3 of the other 4 years | 1 |
| Operations | 12 | 3% | 5% | 0 a day, more than 2 of the other 4 years | 1 |
| Operator, other | 21 | 4% | 7% | 1 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QI | Cautioning due to railhead leaf contamination | 54 |
| T2 | Delay at unstaffed station to non-DOO train | 42 |
| TH | (Senior) Conductor/Train Manager | 38 |
| TG | Driver | 35 |
| M8 | Technical failures above the Solebar | 33 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 23 |
| M9 | Reported fleet equipment defect - no fault found | 23 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 22 |
| M7 | Door and Door system faults | 21 |
| TW | Driver adhering to company professional driving standards or policy | 21 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 1,544 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 883 |
| TH | (Senior) Conductor/Train Manager | 876 |
| TG | Driver | 845 |
| MD | Technical failures below the solebar | 837 |
| M8 | Technical failures above the Solebar | 573 |
| IA | Signal failure (including no fault found) | 500 |
| OU | Delays not Investigated by Network Rail | 397 |
| TZ | Other Passenger Train Operating Company causes | 379 |
| IC | Track circuit failure (including no fault found) | 378 |