861 delay minutes

The biggest share (26%) of the delay picked up at Tenby in the four weeks to 9 December 2023 came from signal, points and power faults.

70% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track121%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power22626%16% 8 a day, the most in 5 years1
Weather and structures5<1%7% 0 a day, the least in 5 years1
Autumn324%7% 1 a day, the most in 5 years-
External253%4% 1 a day, more than 2 of the other 4 years-
Network management567%17% 2 a day, more than 1 of the other 4 years1
The operators' causes
Train faults19423%16% 7 a day, more than 3 of the other 4 years1
Traincrew12114%11% 4 a day, the most in 5 years2
Stations13516%3% 5 a day, the most in 5 years-
Operations303%5% 1 a day, the most in 5 years-
Operator, other253%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
T2Delay at unstaffed station to non-DOO train132
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps103
IISignalling lineside cable fault82
IBPoints failure (including no fault found)51
TGDriver49
TH(Senior) Conductor/Train Manager43
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure42
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)33
MDTechnical failures below the solebar32
QHAdhesion problems due to leaf contamination29
Since 2018
CodeWhat Network Rail loggedMinutes
T2Delay at unstaffed station to non-DOO train4,289
MDTechnical failures below the solebar2,217
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,885
TGDriver1,699
TH(Senior) Conductor/Train Manager1,464
M8Technical failures above the Solebar1,285
OUDelays not Investigated by Network Rail1,097
IBPoints failure (including no fault found)1,029
ILToken equipment failure (including no fault found)1,007
ICTrack circuit failure (including no fault found)779