Tenby
861 delay minutes
The biggest share (26%) of the delay picked up at Tenby in the four weeks to 9 December 2023 came from signal, points and power faults.
70% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 12 | 1% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 226 | 26% | 16% | 8 a day, the most in 5 years | 1 |
| Weather and structures | 5 | <1% | 7% | 0 a day, the least in 5 years | 1 |
| Autumn | 32 | 4% | 7% | 1 a day, the most in 5 years | - |
| External | 25 | 3% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 56 | 7% | 17% | 2 a day, more than 1 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 194 | 23% | 16% | 7 a day, more than 3 of the other 4 years | 1 |
| Traincrew | 121 | 14% | 11% | 4 a day, the most in 5 years | 2 |
| Stations | 135 | 16% | 3% | 5 a day, the most in 5 years | - |
| Operations | 30 | 3% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 25 | 3% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 132 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 103 |
| II | Signalling lineside cable fault | 82 |
| IB | Points failure (including no fault found) | 51 |
| TG | Driver | 49 |
| TH | (Senior) Conductor/Train Manager | 43 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 42 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 33 |
| MD | Technical failures below the solebar | 32 |
| QH | Adhesion problems due to leaf contamination | 29 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 4,289 |
| MD | Technical failures below the solebar | 2,217 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,885 |
| TG | Driver | 1,699 |
| TH | (Senior) Conductor/Train Manager | 1,464 |
| M8 | Technical failures above the Solebar | 1,285 |
| OU | Delays not Investigated by Network Rail | 1,097 |
| IB | Points failure (including no fault found) | 1,029 |
| IL | Token equipment failure (including no fault found) | 1,007 |
| IC | Track circuit failure (including no fault found) | 779 |