1,182 delay minutes

The biggest share (19%) of the delay picked up at Thirsk in the four weeks to 9 December 2023 came from faulty trains.

69% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track16614%8% 6 a day, more than 3 of the other 4 years-
Signals, points and power14012%16% 5 a day, more than 1 of the other 4 years-
Weather and structures20117%7% 7 a day, more than 3 of the other 4 years-
Autumn333%7% 1 a day, more than 2 of the other 4 years-
External333%4% 1 a day, more than 1 of the other 4 years-
Network management17915%17% 6 a day, more than 1 of the other 4 years-
The operators' causes
Train faults21919%16% 8 a day, more than 2 of the other 4 years1
Traincrew14612%11% 5 a day, the most in 5 years-
Stations121%3% 0 a day, the least in 5 years-
Operations353%5% 1 a day, more than 3 of the other 4 years-
Operator, other182%7% 1 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.120
TGDriver110
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail92
OUDelays not Investigated by Network Rail91
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions80
MWWeather - effect on T&RS equipment49
MNBrake and brake systems faults; including wheel flats where no other cause had been identified47
IRBroken/cracked/twisted/buckled/flawed rail39
M8Technical failures above the Solebar37
IBPoints failure (including no fault found)32
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver2,894
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,591
MDTechnical failures below the solebar2,472
IBPoints failure (including no fault found)2,208
I1Overhead line/third rail defect2,191
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,744
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,653
M8Technical failures above the Solebar1,428
IRBroken/cracked/twisted/buckled/flawed rail1,419
M7Door and Door system faults1,284